Full Length Research Paper
References
Andersson D (2005). Approaches to Integrated Strategic/Tatical Forest Planning. Swedish University of Agricultural Sciences, Department of Forest Resource Management and Geomatics, Umeå, Sweden. |
|
Bachmatiuk J, Garcia-Gonzalo J, Borges JG (2015). Analysis of the performance of different implementations of a heuristic method to optimize forest harvest scheduling. Silva Fennica 49(4):1-18. |
|
Banhara JR, Rodriguez LCE, Seixas F, Moreira JMMÁP, Silva LMS, Nobre SR, Cogswell A (2010). Agendamento otimizado da colheita de madeira de eucaliptos sob restrições operacionais, espaciais e climáticas]. Scientia Forestalis 38(85):85-95. |
|
Bettinger P, Boston K, Siry J, Grebner D (2017). Forest management and planning 2nd ed. Academic Press: London, UK. |
|
Bettinger P, Boston K (2017). Forest Planning Heuristics - Current Recommendations and Research Opportunities for s-Metaheuristics. Forests 8(12):476. |
|
Binoti DHB (2012). Sistemas computacionais aplicados ao manejo florestal . Universidade Federal de Viçosa, Viçosa, MG, Brazil. 113p. |
|
Binoti DHB (2010). Estratégias de regulação de florestas equiâneas com vistas ao manejo da paisagem . Universidade Federal de Viçosa, Viçosa, MG, Brazil. 145p. |
|
Borges P, Eid T, Bergseng E (2014). Applying simulated annealing using different methods for the neighborhood search in forest planning problems. European Journal of Operational Research 233(3):700-710. |
|
Campos JCC, Leite HG (2017). Mensuração Florestal: Perguntas e Respostas, 5th ed. Editora UFV, Viçosa, MG, Brazil. |
|
Carvalho KHA, Silva ML, Leite HG, Binoti DHB, Silva LF (2016). Influência de diferentes funções objetivo em modelos de regulação florestal. Revista Agroambiente 10(4):371-380. |
|
Daniel CJ, Ter-mikaelian MT, Wotton BM, Rayfield B, Fortin MJ (2017). Incorporating uncertainty into forest management planning : Timber harvest, wildfire and climate change in the boreal forest. Forest Ecology and Management 400(15):542-554. |
|
Davis L, Johnson KN, Bettinger P, Howard T (2000). Forest Management, 4th ed. McGraw-Hill, New York, N.Y., USA. |
|
European Central Bank (2019). |
|
Eriksson LO (2006). Planning under uncertainty at the forest level: A systems approach. Scandinavian Journal of Forest Research 21(56):111-117. |
|
Eyvindson K, Kangas A (2018). Guidelines for risk management in forest planning - what is risk and when is risk management useful? Canadian Journal of Forest Research 48(4):309-316. |
|
Fonseca TF, Cerveira A, MotaA(2012). An integer programming model for a forest harvest problem in Pinus pinaster stands. Forest Systems 21(2):272-283. |
|
Garcia-Gonzalo J, Pais C, Bachmatiuk J, Weintraub A (2016). Accounting for climate change in a forest planning stochastic optimization model. Canadian Journal of Forest Research 46(9):1111-1121. |
|
Hahn WA, Härtl F, Irland LC, Kohler C, Moshammer R, Knoke T (2014). Financially optimized management planning under risk aversion results in even-flow sustained timber yield. Forest Policy and Economics 42:30-41. |
|
Heinonen T, Pukkala T (2004). A comparison of one- and two-compartment neighbourhoods in heuristic search with spatial forest management goals. Silva Fennica 38(3):319-332. |
|
Johnson KN, Scheurman HL (1977). Techniques for Prescribing Optimal Timber Harvest and Investment Under Different Objectives-Discussion and Synthesis. Forest Science 23(1):1-31. |
|
Kangas AS, Kangas J (2004). Probability, possibility and evidence: approaches to consider risk and uncertainty in forestry decision analysis. Forest Policy and Economics 6(2):169-188. |
|
Leuschner WA, Porter JR, Reynolds MR, Burkhart HE (1975). A Linear Programming Model for Multiple-use Planning. Canadian Journal of Forest Research 5(3):485-491. |
|
Machado CC (2014). Planejamento e colheita florestal, 3rd ed. Editora UFV, Viçosa, MG, Brazil. |
|
Martins I, Ye M, Constantino M, Fonseca MC, Cadima J (2014). Modeling target volume flows in forest harvest scheduling subject to maximum area restrictions. Top 22(1):343-362. |
|
Messier C, Puettmann K, Filotas E, Coates D (2016). Dealing with Non-linearity and Uncertainty in Forest Management. Current Forestry Reports 2(2):150-161. |
|
Murray AT, Church RL (1995). Heuristic solution approaches to operational forest planning problems. Operations-Research-Spektrum 17(2):193-203. |
|
Nanang DM, Hauer GK (2008). Integrating a random utility model for non-timber forest users into a strategic forest planning model. Journal of Forest Economics 14(2):133-153. |
|
Nascimento FAF, Arce JE, Dias AN, Figueiredo-Filho A, Miranda GM, Carnieri C (2013). Meta-Heurística Otimização por Enxame de Partículas Aplicada ao Planejamento Florestal. In: Lopes HS, Rodrigues LCA, Steiner MTA (eds.) Meta-Heurísticas em Pesquisa Operacional Omnipax, Curitiba, PR, Brazil. pp. 355-366. |
|
Nilsson M, Westerlund DS, Wahlberg O, Eriksson LO (2012). Forest planning in a Swedish company - a knowledge management analysis of forest information. Silva Fennica 46(5):717-731. |
|
Öhman K, Eriksson L (2010). Aggregating harvest activities in long term forest planning by minimizing harvest area perimeters. Silva Fennica 44(1):77-89. |
|
Pasalodos-Tato M, Mäkinen A, Garcia-Gonzalo J, Borges JG, Lämås T, Eriksson LO (2013). Assessing uncertainty and risk in forest planning and decision support systems : review of classical methods and introduction of innovative approaches. Forest Systems 22(2):282-303. |
|
Pukkala T (1998). Multiple risks in multi-objective forest planning: Integration and importance. Forest Ecology and Management 111(2-3):265-284. |
|
Rodrigues FL, Leite HG, Santos HN, Souza ALS, Ribeiro CAAS (2004a). Metaheurística Simulated Annealing para solução de problemas de planejamento florestal com restrições de integridade. Revista Árvore 28(2):247-256. |
|
Rodrigues FL, Leite HG, Santos HN, Souza AL, Silva GF (2004b). Metaheurística algoritmo genético para solução de problemas de planejamento florestal com restrições de integridade. Revista Árvore 28(2):233-245. |
|
Rodrigues FL, Silva GF, Leite HG, Xavier AC, Pezzopane JEM (2006). Um modelo de regulação florestal e suas implicações na formulação e solução de problemas com restrições de recobrimento. Revista Árvore 30(5):769-778. |
|
Sterk B, Leeuwis C, Van Ittersum MK (2009). Land use models in complex societal problem solving: Plug and play or networking? Environmental Modelling and Software 24(2):165-172. |
|
Thorsen BJ, Helles F (1998). Optimal stand management with endogenous risk of sudden destruction. Forest Ecology and Management 108(3):287-299. |
|
Tóth SF, Mcdill ME, Könny N, George S (2012). A Strengthening Procedure for the Path Formulation of the Area-Based Adjacency Problem in Harvest Scheduling Models. Mathematical and Computacional Forestry and Natural-Resource Sciences 4(1):27-49 |
|
Weintraub A, Cholaky A (1991). A Hierarchical Approach to Forest Planning. Forest Science 37(2):439-460. |
|
Weintraub A, Davis L (1996). Hierarchical planning in forest resource management: defining the dimensions of the subject area. In: Proceedings of a workshop on hierarchical approaches to forest management in public and private organizations. Martell DL, Davis LS, Weintraub A (eds). Petwawa National Forestry Institute. Information Report PI-X-124. pp. 2-14. |
|
Zhu J, Bettinger P, Li R (2007). Additional insight into the performance of a new heuristic for solving spatially constrained forest planning problems. Silva Fennica 41(4):667-698. |
|
Copyright © 2023 Author(s) retain the copyright of this article.
This article is published under the terms of the Creative Commons Attribution License 4.0