African Journal of
Agricultural Research

  • Abbreviation: Afr. J. Agric. Res.
  • Language: English
  • ISSN: 1991-637X
  • DOI: 10.5897/AJAR
  • Start Year: 2006
  • Published Articles: 6863

Full Length Research Paper

Modeling the sensitivity of strategic plans to risks and uncertainties in forest management

Ricardo Rodrigues de Oliveira Neto
  • Ricardo Rodrigues de Oliveira Neto
  • Department of Forest, Universidade Federal de Viçosa, CEP 36570-000, Viçosa-MG, Brazil.
  • Google Scholar
Simone Silva
  • Simone Silva
  • Department of Forest, Universidade Federal de Viçosa, CEP 36570-000, Viçosa-MG, Brazil.
  • Google Scholar
Ana Carolina de Albuquerque Santos
  • Ana Carolina de Albuquerque Santos
  • Department of Forest, Universidade Federal de Viçosa, CEP 36570-000, Viçosa-MG, Brazil.
  • Google Scholar
Rodrigo Vieira Leite
  • Rodrigo Vieira Leite
  • Department of Forest, Universidade Federal de Viçosa, CEP 36570-000, Viçosa-MG, Brazil.
  • Google Scholar
José Marinaldo Gleriani
  • José Marinaldo Gleriani
  • Department of Forest, Universidade Federal de Viçosa, CEP 36570-000, Viçosa-MG, Brazil.
  • Google Scholar
Helio Garcia Leite
  • Helio Garcia Leite
  • Department of Forest, Universidade Federal de Viçosa, CEP 36570-000, Viçosa-MG, Brazil.
  • Google Scholar
Daniel Henrique Breda Binoti
  • Daniel Henrique Breda Binoti
  • DAP Florestal, R. Papa João XXIII, 9 - CEP 36570-000, Viçosa - Minas Gerais, Brazil.
  • Google Scholar
Aline Edwiges Mazon de Alcântara
  • Aline Edwiges Mazon de Alcântara
  • Celulose Nipo-Brasileira S/A, Rod Br 381, s/n km 172 - CEP 35196-000, Belo Oriente - Minas Gerais, Brazil.
  • Google Scholar
Leonardo Pereira Fardin
  • Leonardo Pereira Fardin
  • Department of Forest, Universidade Federal de Viçosa, CEP 36570-000, Viçosa-MG, Brazil.
  • Google Scholar


  •  Received: 20 November 2019
  •  Accepted: 31 January 2020
  •  Published: 29 February 2020

References

Andersson D (2005). Approaches to Integrated Strategic/Tatical Forest Planning. Swedish University of Agricultural Sciences, Department of Forest Resource Management and Geomatics, Umeå, Sweden.

 

Bachmatiuk J, Garcia-Gonzalo J, Borges JG (2015). Analysis of the performance of different implementations of a heuristic method to optimize forest harvest scheduling. Silva Fennica 49(4):1-18.
Crossref

 
 

Banhara JR, Rodriguez LCE, Seixas F, Moreira JMMÁP, Silva LMS, Nobre SR, Cogswell A (2010). Agendamento otimizado da colheita de madeira de eucaliptos sob restrições operacionais, espaciais e climáticas]. Scientia Forestalis 38(85):85-95.

 
 

Bettinger P, Boston K, Siry J, Grebner D (2017). Forest management and planning 2nd ed. Academic Press: London, UK.

 
 

Bettinger P, Boston K (2017). Forest Planning Heuristics - Current Recommendations and Research Opportunities for s-Metaheuristics. Forests 8(12):476.
Crossref

 
 

Binoti DHB (2012). Sistemas computacionais aplicados ao manejo florestal . Universidade Federal de Viçosa, Viçosa, MG, Brazil. 113p.

 
 

Binoti DHB (2010). Estratégias de regulação de florestas equiâneas com vistas ao manejo da paisagem . Universidade Federal de Viçosa, Viçosa, MG, Brazil. 145p.

 
 

Borges P, Eid T, Bergseng E (2014). Applying simulated annealing using different methods for the neighborhood search in forest planning problems. European Journal of Operational Research 233(3):700-710.
Crossref

 
 

Campos JCC, Leite HG (2017). Mensuração Florestal: Perguntas e Respostas, 5th ed. Editora UFV, Viçosa, MG, Brazil.

 
 

Carvalho KHA, Silva ML, Leite HG, Binoti DHB, Silva LF (2016). Influência de diferentes funções objetivo em modelos de regulação florestal. Revista Agroambiente 10(4):371-380.
Crossref

 
 

Daniel CJ, Ter-mikaelian MT, Wotton BM, Rayfield B, Fortin MJ (2017). Incorporating uncertainty into forest management planning : Timber harvest, wildfire and climate change in the boreal forest. Forest Ecology and Management 400(15):542-554.
Crossref

 
 

Davis L, Johnson KN, Bettinger P, Howard T (2000). Forest Management, 4th ed. McGraw-Hill, New York, N.Y., USA.

 
 

European Central Bank (2019). 

View

 
 

Eriksson LO (2006). Planning under uncertainty at the forest level: A systems approach. Scandinavian Journal of Forest Research 21(56):111-117.
Crossref

 
 

Eyvindson K, Kangas A (2018). Guidelines for risk management in forest planning - what is risk and when is risk management useful? Canadian Journal of Forest Research 48(4):309-316.
Crossref

 
 

Fonseca TF, Cerveira A, MotaA(2012). An integer programming model for a forest harvest problem in Pinus pinaster stands. Forest Systems 21(2):272-283.
Crossref

 
 

Garcia-Gonzalo J, Pais C, Bachmatiuk J, Weintraub A (2016). Accounting for climate change in a forest planning stochastic optimization model. Canadian Journal of Forest Research 46(9):1111-1121.
Crossref

 
 

Hahn WA, Härtl F, Irland LC, Kohler C, Moshammer R, Knoke T (2014). Financially optimized management planning under risk aversion results in even-flow sustained timber yield. Forest Policy and Economics 42:30-41.
Crossref

 
 

Heinonen T, Pukkala T (2004). A comparison of one- and two-compartment neighbourhoods in heuristic search with spatial forest management goals. Silva Fennica 38(3):319-332.
Crossref

 
 

Johnson KN, Scheurman HL (1977). Techniques for Prescribing Optimal Timber Harvest and Investment Under Different Objectives-Discussion and Synthesis. Forest Science 23(1):1-31.

 
 

Kangas AS, Kangas J (2004). Probability, possibility and evidence: approaches to consider risk and uncertainty in forestry decision analysis. Forest Policy and Economics 6(2):169-188.
Crossref

 
 

Leuschner WA, Porter JR, Reynolds MR, Burkhart HE (1975). A Linear Programming Model for Multiple-use Planning. Canadian Journal of Forest Research 5(3):485-491.
Crossref

 
 

Machado CC (2014). Planejamento e colheita florestal, 3rd ed. Editora UFV, Viçosa, MG, Brazil.

 
 

Martins I, Ye M, Constantino M, Fonseca MC, Cadima J (2014). Modeling target volume flows in forest harvest scheduling subject to maximum area restrictions. Top 22(1):343-362.
Crossref

 
 

Messier C, Puettmann K, Filotas E, Coates D (2016). Dealing with Non-linearity and Uncertainty in Forest Management. Current Forestry Reports 2(2):150-161.
Crossref

 
 

Murray AT, Church RL (1995). Heuristic solution approaches to operational forest planning problems. Operations-Research-Spektrum 17(2):193-203.
Crossref

 
 

Nanang DM, Hauer GK (2008). Integrating a random utility model for non-timber forest users into a strategic forest planning model. Journal of Forest Economics 14(2):133-153.
Crossref

 
 

Nascimento FAF, Arce JE, Dias AN, Figueiredo-Filho A, Miranda GM, Carnieri C (2013). Meta-Heurística Otimização por Enxame de Partículas Aplicada ao Planejamento Florestal. In: Lopes HS, Rodrigues LCA, Steiner MTA (eds.) Meta-Heurísticas em Pesquisa Operacional Omnipax, Curitiba, PR, Brazil. pp. 355-366.
Crossref

 
 

Nilsson M, Westerlund DS, Wahlberg O, Eriksson LO (2012). Forest planning in a Swedish company - a knowledge management analysis of forest information. Silva Fennica 46(5):717-731.
Crossref

 
 

Öhman K, Eriksson L (2010). Aggregating harvest activities in long term forest planning by minimizing harvest area perimeters. Silva Fennica 44(1):77-89.
Crossref

 
 

Pasalodos-Tato M, Mäkinen A, Garcia-Gonzalo J, Borges JG, Lämås T, Eriksson LO (2013). Assessing uncertainty and risk in forest planning and decision support systems : review of classical methods and introduction of innovative approaches. Forest Systems 22(2):282-303.
Crossref

 
 

Pukkala T (1998). Multiple risks in multi-objective forest planning: Integration and importance. Forest Ecology and Management 111(2-3):265-284.
Crossref

 
 

Rodrigues FL, Leite HG, Santos HN, Souza ALS, Ribeiro CAAS (2004a). Metaheurística Simulated Annealing para solução de problemas de planejamento florestal com restrições de integridade. Revista Árvore 28(2):247-256.
Crossref

 
 

Rodrigues FL, Leite HG, Santos HN, Souza AL, Silva GF (2004b). Metaheurística algoritmo genético para solução de problemas de planejamento florestal com restrições de integridade. Revista Árvore 28(2):233-245.
Crossref

 
 

Rodrigues FL, Silva GF, Leite HG, Xavier AC, Pezzopane JEM (2006). Um modelo de regulação florestal e suas implicações na formulação e solução de problemas com restrições de recobrimento. Revista Árvore 30(5):769-778.
Crossref

 
 

Sterk B, Leeuwis C, Van Ittersum MK (2009). Land use models in complex societal problem solving: Plug and play or networking? Environmental Modelling and Software 24(2):165-172.
Crossref

 
 

Thorsen BJ, Helles F (1998). Optimal stand management with endogenous risk of sudden destruction. Forest Ecology and Management 108(3):287-299.
Crossref

 
 

Tóth SF, Mcdill ME, Könny N, George S (2012). A Strengthening Procedure for the Path Formulation of the Area-Based Adjacency Problem in Harvest Scheduling Models. Mathematical and Computacional Forestry and Natural-Resource Sciences 4(1):27-49

 
 

Weintraub A, Cholaky A (1991). A Hierarchical Approach to Forest Planning. Forest Science 37(2):439-460.

 
 

Weintraub A, Davis L (1996). Hierarchical planning in forest resource management: defining the dimensions of the subject area. In: Proceedings of a workshop on hierarchical approaches to forest management in public and private organizations. Martell DL, Davis LS, Weintraub A (eds). Petwawa National Forestry Institute. Information Report PI-X-124. pp. 2-14.

 
 

Zhu J, Bettinger P, Li R (2007). Additional insight into the performance of a new heuristic for solving spatially constrained forest planning problems. Silva Fennica 41(4):667-698.
Crossref