Full Length Research Paper
References
Axsater S (2006). Planning order release for an assembly system with random operations times. ORSpectrum, 27:459–470. | ||||
Baker KR (1993). Requirement planning. In: Graves, S.C. (Ed.), Handbooks in Operations Research and Management Science, Logistics of Production and Inventory. North Holland, Amsterdam, 4:571–628. | ||||
Bragg DJ, Duplaga EA, Watis CA (1999). The effects of partial order release and component reservation on inventory and customer service performance in an MRP environment. Int. J. Prod. Res. 37:523-538. | ||||
Chaharsooghi SK, Heydari J (2010). Supply chain coordination for the joint determination of order quantity and reorder point using credit option. European J. Operational Res. 204(1):86–95. | ||||
Chu C, Proth JM, Xie X (1993). Supply management in assembly systems. Naval Research Logistics, 40:933-949. | ||||
Dolgui A, Prodhon C (2007). Supply planning under uncertainties in MRP environments: a state of the art, Ann. Rev. Control, 31:269-279. | ||||
Dolgui A, Proth JM (2010). Supply Chain Engineering: Useful Methods and Techniques. Springer. | ||||
Faicel H, Xavier D, Alexandre D (2009). Genetic algorithm for supply planning in two-level assembly systems with random lead-times; Engineering Applications of Artificial Intelligence 22:906–915. | ||||
Graves SC (2011). Uncertainty and production planning. In: Kempf, K.G., Keskinocak, P., Uzsoy, R. (Eds.), Planning Production and Inventories in the Extended Enterprise. A State of the Art Handbook. Series: International Series in Operations Research and Management Science, 151:83–102. | ||||
Gupta SM, Brennan L (1995). MRP systems under supply and process uncertainty in an integrated shop floor control. Int. J. Prod. Res. 33:205-220. | ||||
Mohamed-Aly Louly, Alexandre D, Faicel H (2008). Supply planning for single-level assembly system with stochastic component delivery times and service-level constraint; Int. J. Production Economics 115:236-247. | ||||
Mohamed-AlyLouly, Alexandre D (2011). Optimal time phasing and periodicity for MRP with POQ policy . Int. J. Prod. Econ. 131:76–86. | ||||
Mohamed-AlyLouly, Alexandre D, Abdulrahman A (2012). Optimal MRP offsetting for assembly systems with stochastic lead times: POQ policy and service level constraint; J. Intel Manuf. 23:2485–2495. | ||||
Mohamed-AlyLouly, Alexandre D (2013). Optimal MRP parameters for a single item inventory with random replenishment lead time, POQ policy and service level constraint; Int. J. Prod. Econ. 143:35–40. | ||||
Ould-Loudy MA, Dolgui A (2004). The MPS parameterization under lead-time uncertainty. Int. J. Prod. Econ. 90:369–376. | ||||
Sipper D, Bulfin Jr, RL (1998). Production Planning, Control, and Integration (New York: McGraw-Hill). | ||||
Sadeghi H, Makui A, Heydari H (2013). Determining the periodicity and planned lead time in serial-production systems with dependent demand and uncertain lead time. Uncertain Supply Chain Management, 1(2):87-98. | ||||
Tang O, GrubbstrÙm RW (2003). "The detailed coordination problem in a two-level assembly system with stochastic lead-times". Int. J. Prod. Econ. 81/82:415-429. | ||||
Tempelmeier H (2006). Inventory Management in Supply Networks: Problems, Models, Solutions, and Books on demand GmbH. | ||||
Whybark DC, Williams JG (1976). Material Requirements Planning Under Uncertainty. Decision Science, 7:595-606. | ||||
Yano CA (1987). "Stochastic lead-times in two-level assembly systems". IIE Transactions, 9(4):95-106. | ||||
Zipkin P (2000). Foundation of Inventory Management. McGraw Hill. |
Copyright © 2024 Author(s) retain the copyright of this article.
This article is published under the terms of the Creative Commons Attribution License 4.0