International Journal of
Physical Sciences

  • Abbreviation: Int. J. Phys. Sci.
  • Language: English
  • ISSN: 1992-1950
  • DOI: 10.5897/IJPS
  • Start Year: 2006
  • Published Articles: 2572

Full Length Research Paper

Performance analysis of the 23 MWp grid connected photovoltaic plant in Diass Senegal

Fatima LACH-HEB
  • Fatima LACH-HEB
  • Laboratoire Eau-Énergie-Environnement-Procédés Industriels (L3EPI), Ecole Supérieure Polytechnique – UCAD, BP 5085 Dakar-Fann, Senegal.
  • Google Scholar
Mamadou Lamine NDIAYE
  • Mamadou Lamine NDIAYE
  • Laboratoire Eau-Énergie-Environnement-Procédés Industriels (L3EPI), Ecole Supérieure Polytechnique – UCAD, BP 5085 Dakar-Fann, Senegal.
  • Google Scholar
Anna Kerstin USBECK
  • Anna Kerstin USBECK
  • Departement Maschinenbau und Production, Tor 21 20099 Hamburg Raum 210, Germany.
  • Google Scholar
Mohamed Cherif AIDARA
  • Mohamed Cherif AIDARA
  • Laboratoire Eau-Énergie-Environnement-Procédés Industriels (L3EPI), Ecole Supérieure Polytechnique – UCAD, BP 5085 Dakar-Fann, Senegal.
  • Google Scholar


  •  Received: 20 May 2021
  •  Accepted: 14 September 2021
  •  Published: 31 October 2021

References

Adaramola MS, Vågnes EET (2015). Preliminary assessment of a small-scale rooftop PV-grid tied in Norwegian climatic conditions. Energy Conversion and Management 90:458-465.
Crossref

 

Al-Otaibi A, Al-Qattan A, Fairouz F, Al-Mulla A (2015). Performance evaluation of photovoltaic systems on Kuwaiti schools' rooftop. Energy Conversion and Management 95:110-119 
Crossref

 
 

Attari K, Elyaakoubi A, Asselman (2016). Performance analysis and investigation of a grid-connected photovoltaic installation in Morocco. Energy Reports, ISSN 2352-4847, Elsevier, Amsterdam 2:261-266. 
Crossref

 
 

Congedo PM, Malvoni M, Mele M, Degiorgy MG (2013).Performance measurements of monocrystalline silicon PV modules in South-eastern Italy. Energy Conversion and Management 68:1-10 
Crossref

 
 

De Lima CL, Ferreira LA, Morais FHBL (2017). Performance analysis of a grid connected photovoltaic system in northeastern Brazil. Energy for Sustainable Development 37:79-85 
Crossref

 
 

Elhadj Sidi CEB, Ndiyae ML, Elbah M, Mbodji A, Ndiyae PA (2016). Performance analysis of the first large-scale (15MWp) grid-connected photovoltaic plant in Mauritania. Energy Conversion and Management 119:411-421. 
Crossref

 
 

Globa Overview (2017).

View

 
 

Kymakis E, Kalykakis S, Papazoglou TM (2009). Performance analysis of a grid connected photovoltaic park on the island of Crete 50(3):433-438.
Crossref

 
 

Lu H, Cai R, Zhang LZ, Lu L, Zhang L (2020). Experimental investigation on deposition reduction of different types of dust on solar PV cells by self-cleaning coatings. Solar Energy 206:365-373. 
Crossref

 
 

Mpholo M, Nchaba T, Monese M (2015). Yield and performance analysis of the first grid-connected solar farm at Moshoeshoe I International Airport, Lesotho. Renewable energy 81:845-852. 
Crossref

 
 

Nouar A (2020). Performance Analysis of a 20 MW Grid-Connected Photovoltaic Installation in Adrar, South of Algeria. Advanced Statistical Modeling, Forecasting, and Fault Detection in Renewable Energy Systems 
Crossref

 
 

Padmavathi K, Daniel SA (2013). Performance analysis of a 3MWp grid connected solar photovoltaic power plant in India. Energy for Sustainable Development 17(6):615-625. 
Crossref

 
 

REN21 (2020).

View

 
 

Sidrach de Cardona M, Mora Lopez B (1999). Performance analysis of a grid-connected photovoltaic system. Energy 24:93-102 
Crossref